December 2022 Project Update
Here’s wishing everyone Happy Holidays!
As you can see from the picture below the driving range structure is up. Also you can see the ball tracking cameras mounted to the roof structure.
We are therefore getting closer and closer to getting finished. The major driving range tasks remaining to get open are:
1. Landscaping around the front of the bays/ground mounted lights and also the outside patio area.
2. Pouring new concrete in the courtyard & putting green area.
3. Building out each driving range bay with dividers, etc..
4. Getting all electrical parts in, the work done and final inspected. 5. Getting the ball tracking system up, running, and fine tuned.
Of the points listed above, it is point 4 that is still the main holdup as some of the electrical panels are on backorder and are due to finally ship on January 5th and arrive January 9th. We can then finish out the electrical, get a final inspection by the City, and get the ball tracking system in place and tested as outlined in point 5.
Here is a picture of the driving range structure from another angle.
Once the electrical panels are delivered we will be able to get closer to what our actual opening day will be. This should be by the end of January!
Again, Happy Holidays!